
Seafloor Study of the Amerasian Basin, Arctic Ocean
Core Transport
Uploaded by: Steve_Stevenoski
On: 1154568268
File Size: 102743
Comments: 0 / Views: 772
Description: Kelly works on the preparing the core for transport and storage.
|
Preparation of Core
Uploaded by: Steve_Stevenoski
On: 1154568208
File Size: 109858
Comments: 0 / Views: 772
Description: Larry Phillips prepares the core after it has been brought on deck.
|
Cage Blast
Uploaded by: Steve_Stevenoski
On: 1154568094
File Size: 75771
Comments: 0 / Views: 811
Description: Large air bubble released when guns are triggered produces low frequency sound that is detected by seismic instruments.
|
Russell
Uploaded by: Steve_Stevenoski
On: 1154568023
File Size: 57143
Comments: 0 / Views: 778
Description: Russell is a real ladies man.
|
First Cage Deployment
Uploaded by: Steve_Stevenoski
On: 1154567979
File Size: 113431
Comments: 0 / Views: 740
Description: Cage nearly ready for the first deployment. Aft area with four Bolt guns.
|
Final Check on Air Guns
Uploaded by: Steve_Stevenoski
On: 1154567908
File Size: 102594
Comments: 0 / Views: 786
Description: Matt McDonald makes final check on one of the air guns.
|
Air guns
Uploaded by: Steve_Stevenoski
On: 1154371187
File Size: 102937
Comments: 0 / Views: 795
Description: Steffen checks lines and hoses on the air guns
|
Setting up the benthos...
Uploaded by: Steve_Stevenoski
On: 1154371103
File Size: 52059
Comments: 0 / Views: 842
Description: Setting up the benthos corer
|
First core
Uploaded by: Steve_Stevenoski
On: 1154371043
File Size: 63992
Comments: 0 / Views: 741
Description: Preparing to take the first core
|
Hoisting the hoses and...
Uploaded by: Steve_Stevenoski
On: 1154370994
File Size: 100267
Comments: 0 / Views: 814
Description: Hoisting the hoses and wires to the top of the gun cage
|
Crew
Uploaded by: Steve_Stevenoski
On: 1154270736
File Size: 81163
Comments: 0 / Views: 840
Description: Captain Russell, Commander Jackson, Chase Asher, Russel Young and Marcy Davis.
|
Welding the Gun Cage
Uploaded by: Steve_Stevenoski
On: 1154270665
File Size: 86692
Comments: 0 / Views: 790
Description: Josh welds on the gun cage.
|
Hoses
Uploaded by: Steve_Stevenoski
On: 1154270591
File Size: 73850
Comments: 0 / Views: 779
Description: Tangle of hoses and wires in the protective tube on deck.
|
Ice
Uploaded by: Steve_Stevenoski
On: 1154270520
File Size: 53247
Comments: 0 / Views: 791
Description: 2 meter block of ice forced out by the ship's propellers.
|
End of watch
Uploaded by: Steve_Stevenoski
On: 1154119428
File Size: 87924
Comments: 0 / Views: 768
Description: End of the watch
|
Air guns
Uploaded by: Steve_Stevenoski
On: 1154119332
File Size: 101742
Comments: 0 / Views: 790
Description: Russell and Matt work on installing air guns
|
Assembly of antenna st...
Uploaded by: Steve_Stevenoski
On: 1154119256
File Size: 100714
Comments: 0 / Views: 773
Description: Peggy and Harm complete assembly of antenna stands
|
Test deployment of the...
Uploaded by: Steve_Stevenoski
On: 1154119135
File Size: 90152
Comments: 0 / Views: 850
Description: Test deployment of the airgun cage
|
Test deployment of the...
Uploaded by: Steve_Stevenoski
On: 1154119083
File Size: 74676
Comments: 0 / Views: 863
Description: Test deployment of the seismic instruments on the ice 2
|
Test deployment of the...
Uploaded by: Steve_Stevenoski
On: 1154119033
File Size: 81632
Comments: 0 / Views: 760
Description: Test deployment of the seismic instruments on the ice
|
|