
( Log In ) Log In is for TREC Teachers & Researchers only
![]() |
Uploaded by: Misty_Nikula_Ohlsen On: Jul 25 2006, 05:56 PM | Views: 933 · Comments: 0 |
---|---|
On the left: Bre MacInnis is working to set up the survey instrument – it is on top of the tripod. She will need to level the instrument with the tripod before we can take a measurement. She is taking the scaled rod out of its storage bag. On the right: Jody Bourgeois down in the hole that Jesse Einhorn dug, describing the cross-section of deposits. There were several tephra layers, some volcanic cinder layers and at least 2-3 tsunami deposits (beach sand). This excavation was nearly 500 meters from the current beach front. |
|
![]() |
![]() |
NSF Acknowledgment & Disclaimer | Time is now: 1st July 2025 - 04:15 AM |
There appears to be an error with the database.
You can try to refresh the page by clicking here.
Error Returned
We apologise for any inconvenience